Striker Machine PKL-SBY

Clients: -

Catagory: Heavy Weight Transport

Dextrans Projects successful delivery from Port Klang to Surabaya

Dextrans Group (Project Forwarding & Chartering division) recently handled and completed a delivery fulfilling its responsibility of heavylift operations and vessel charter. We successfully delivered 6 Units of brand new striker machine on behalf of our clients from Port Klang to Surabaya for a copper mining Project in Indonesia factory to factory.

Our well-co-ordinated assembled team ensured the timely delivery and the safety from Striker Yard to direct delivery to the ship side for direct loading .The team worked throughout the evenings to ensure a smooth and safe loading and the customer was hugely satisfied it was completed within 48 hours in time for the vessel’s departure.

The mining machine weighs 88 tons each with about 23 meters in length .The Machines arrived at North Port(Malaysia) safely with Police escort from Striker Yard in Ipoh about 200km away manouvering through narrow slip roads before arriving at the loading terminal with police escort required all the way.

After loading onboard vessel with our own appointed MWS inspection and customs papers in place, the vessel set sail for Surabaya.

The delivery of these units at the mining site at destination was a challenge. The draft at jetty barly met the standards for these equipments to e discharged ad the whole operations had to be done within the high tide period allocated. Additionally in order to be allowed direct loading onto the trailers we had to work overtime to ensure that customs papers are approved. Overall, we had a effective team that ensured the whole project was well managed and a satisfied customer.

Striker Machine PKL-SBY

Dextrans Projects successful delivery from Port Klang to Surabaya

Dextrans Group (Project Forwarding & Chartering division) recently handled and completed a delivery fulfilling its responsibility of heavylift operations and vessel charter. We successfully delivered 6 Units of brand new striker machine on behalf of our clients from Port Klang to Surabaya for a copper mining Project in Indonesia factory to factory.

Our well-co-ordinated assembled team ensured the timely delivery and the safety from Striker Yard to direct delivery to the ship side for direct loading .The team worked throughout the evenings to ensure a smooth and safe loading and the customer was hugely satisfied it was completed within 48 hours in time for the vessel’s departure.

The mining machine weighs 88 tons each with about 23 meters in length .The Machines arrived at North Port(Malaysia) safely with Police escort from Striker Yard in Ipoh about 200km away manouvering through narrow slip roads before arriving at the loading terminal with police escort required all the way.

After loading onboard vessel with our own appointed MWS inspection and customs papers in place, the vessel set sail for Surabaya.

The delivery of these units at the mining site at destination was a challenge. The draft at jetty barly met the standards for these equipments to e discharged ad the whole operations had to be done within the high tide period allocated. Additionally in order to be allowed direct loading onto the trailers we had to work overtime to ensure that customs papers are approved. Overall, we had a effective team that ensured the whole project was well managed and a satisfied customer.